879-3040 Modbus / M-Bus energy meter for 1 A / 5 A current transformers MID
Wago 879-3040 is a three-phase energy meter for indirect measurement using current transformers with a secondary current of 1 A or 5 A. In 3 × 230/400 V AC networks, it records imported and exported active and reactive energy and measures the electrical quantities of each phase. It is suitable for monitoring consumption in buildings, production equipment and distribution boards where the measured current is fed to the meter through external current transformers.
The integrated Modbus RTU over RS-485 and M-Bus interfaces allow data to be transmitted to a building management or energy management system. The backlit LCD displays measured values directly on the device. The 2PU CT design occupies two modules on the DIN rail, while Push-in CAGE CLAMP terminals with levers simplify wiring.
Measurement, tariffs and communication
- Measurement using 1 A or 5 A current transformers: the ratio is set according to the rated values of the transformers used.
- Bidirectional measurement: separate recording of imported and exported active and reactive energy.
- Instantaneous electrical quantities: voltage and current of each phase, active, reactive and apparent power, power factor and mains frequency.
- Four tariffs: the 230 V AC tariff input switches between T1/T2; T3/T4 can be selected using the control buttons or via Bluetooth, Modbus or M-Bus.
- Two configurable S0 pulse outputs: transmission of energy data to a compatible counter or control system.
- Local and wireless configuration: touch-sensitive control buttons and the WAGO Energy Meter Configurator app via Bluetooth.
- Powered from the measured circuit: the meter does not require a separate auxiliary power supply.
Design and certification
Model 879-3040 is MID certified. Active energy is measured with accuracy class B according to EN 50470-3. The compact 2PU CT design is intended for mounting on a 35 mm DIN rail.
Required accessories to purchase separately (not included)
Current transformers suitable for the measured circuit. A standard three-phase, four-wire installation requires 3 transformers with the same ratio, one for each phase. The following recommended ranges have a 5 A secondary current and accuracy class 0.5:
- 855-305 – current transformers 100 to 750 A / 5 A, Ø 26 mm opening; 9 variants according to the primary current.
- 855-405 – current transformers 200 to 750 A / 5 A, Ø 32 mm opening; 7 variants according to the primary current.
Select the ratio according to the current of the measured circuit and the opening according to the dimensions of the conductor or busbar. When designing the secondary circuit, take into account the transformer's rated burden and the load imposed by the connecting leads and meter. The corresponding ratio and secondary current must be set in the meter.
Technical data
- Measurement method: indirect, using external current transformers; two-wire, three-wire and four-wire networks according to the wiring diagram
- Rated voltage: 3 × 230/400 V AC, tolerance ±20 %
- Transformer secondary current: selectable 1 A or 5 A; maximum input current 5 A
- Primary current setting: 1–9,999 A with a 1 A secondary current or 5–9,995 A with a 5 A secondary current
- Frequency: rated 50 Hz, operating range 45–60 Hz
- Communication: Modbus RTU, two-wire RS-485; M-Bus; Bluetooth
- Input: 1× 230 V AC tariff input
- Outputs: 2× configurable S0 pulse output
- Display: backlit LCD
- Mounting: 35 mm DIN rail, width 2 modules
- Dimensions (W × H × D): 36 × 140 × 63 mm including covers; height without covers 97 mm
- Degree of protection: IP51 at the front, IP20 in the connection area
- Protection class: II
- Operating temperature: −40 to +70 °C
- Housing material: polycarbonate PC 940A
- Weight: 165 g
Connection and configuration
The voltage, current, communication and tariff input terminals use Push-in CAGE CLAMP with levers. They accept solid and fine-stranded conductors of 0.2–4 mm², or 0.25–2.5 mm² with ferrules; the stripping length is 9–11 mm. Wiring must match the selected network and the polarity of the current transformers.
The transformer ratio can be changed a maximum of seven times in the protected settings. The meter retains a history of ratio changes and the corresponding energy registers, so the correct ratio should be selected during commissioning.
Estimated delivery time: 6–10 days
Planning an order over €5,000?
Request an individual quotation for your project.